Anacortes Siding Installer
Composite Decking · Anacortes, WA

Composite Decking in March Point — Anacortes, WA

Home › Composite Decking in March Point — Anacortes, WA
25 Years in Business2,000+ ProjectsLicensed & InsuredFree EstimatesServing Anacortes & Skagit County

March Point sits on a peninsula between Fidalgo Bay and Padilla Bay just outside Anacortes, and any outdoor structure built there — a deck included — deals with a heavier weather load than a comparable structure a few miles inland. Composite decking has become the default choice for a lot of homeowners in this part of Skagit County who are tired of yearly staining, splinters, and the slow rot a wood deck develops under sustained moisture. Done right, a composite deck on a March Point property can go decades with little more than occasional cleaning. Done wrong — wrong fasteners, wrong drainage, wrong framing — it can develop problems just as fast as a poorly built wood deck would. This page covers what a composite deck actually needs to hold up in this specific location, and what our process looks like when we build one.

What March Point's Exposure Does to an Outdoor Deck

A deck on March Point isn't sheltered the way a deck in a denser, more tree-covered part of Anacortes often is. The peninsula sits exposed to wind and salt air coming off open water from more than one direction, and driving rain — rain pushed sideways by wind rather than falling straight down — reaches surfaces here that would stay relatively dry on a more protected inland lot. Skagit County's long moss season adds another layer: shaded or north-facing sections of a deck can stay damp for weeks at a stretch during the wetter months, which is exactly the environment moss and algae need to take hold.

None of that makes decks unusual to build here — most homes in the area have one — but it does change which details matter. Salt-laden air is corrosive to standard fasteners and hardware. Standing moisture at a ledger connection or between deck boards doesn't dry out as quickly as it would on a sunnier, more sheltered site. And UV exposure off open water can be more intense than a shaded inland yard sees. A composite deck built for this location has to account for all three.

Why Composite Decking Fits This Location

Composite decking is made from a blend of wood fiber and plastic, and in most modern products the boards are wrapped in a polymer cap that acts as a moisture and UV barrier. That cap is the main reason composite has become the practical choice for a property like this: it doesn't absorb water the way a solid wood board does, it doesn't need annual staining or sealing, and it resists the graying, splintering, and cupping that wood decking develops under repeated wet-dry cycles.

Capped vs. Uncapped Composite

Not all composite decking is built the same way, and the difference matters more in a wet climate than a dry one. Capped composite — the category most major manufacturers, brands like Trex, TimberTech, and Fiberon among them, sell today — has a polymer shell fully or partially wrapping the board, which is what actually keeps moisture and mildew from reaching the wood-fiber core. Older or budget uncapped composite doesn't have that shell, and it can absorb moisture at the surface over time, which shows up as staining, mold growth, or a slightly spongy feel in older boards. We install capped composite products for that reason — in a climate with this much sustained moisture, the cap isn't a cosmetic upgrade, it's the part doing the actual water-resistance work.

What a Correct Substructure Looks Like

The decking boards get the attention because they're what you see and walk on, but the framing underneath is what actually determines whether a deck lasts. Composite boards are heavier than wood per square foot, and they expand and contract more with temperature swings, so they need consistent, correctly spaced support to avoid sagging or bouncing between joists over time. Framing a composite deck to the same spec as a standard wood deck, without adjusting for those differences, is a common source of early problems.

Ledger Attachment and Flashing

Where a deck attaches to the house — the ledger board — is the single most common point of failure on decks in this climate, composite or wood. If that connection isn't properly flashed, water works its way behind the ledger and into the house's wall framing, and because the deck sits on top of it, the damage can go unnoticed for years. We flash the ledger connection with a proper water-resistant barrier and drainage gap so that any moisture reaching that joint sheds away from the house instead of sitting against it.

Joist Spacing and Hidden Fasteners

Composite manufacturers publish specific joist-spacing requirements for their products, and those specs get tighter for diagonal board patterns or if a deck will see heavy furniture or a hot tub. We frame to the product's actual spec rather than a generic layout, and we use hidden fastener systems designed for composite boards instead of face-screwing through the top — it gives a cleaner look and avoids creating screw-hole entry points where moisture can sit against the fastener.

Drainage, Moss, and Algae Management

Skagit County's moss season is long, and a deck that doesn't shed water well becomes a growing surface for moss and algae just like a roof or a fence does. Composite decking resists staining better than wood, but it isn't immune — organic growth can take hold on any surface that stays damp and shaded long enough, and gaps that trap debris between boards make it worse.

We build in board spacing and a slight slope away from the house so water actually drains instead of pooling, and we keep the substructure ventilated underneath so air can move and the framing dries out between rain events. On a shaded or north-facing section of a March Point property — common given the tree cover and exposure many lots here have — that ventilation is the difference between a deck that just needs an occasional rinse and one that develops a persistent moss problem within a couple of seasons.

How Our Installation Process Works

Site Assessment and Design

We start with a walk of the property to look at grade, drainage, sun and shade exposure, and how the deck will attach to the house. On an exposed peninsula lot, orientation relative to prevailing wind and water often affects board layout and railing choices, not just how the finished deck looks.

Framing and Waterproofing

Ledger flashing, joist layout to the manufacturer's spec, and any waterproof membrane or flashing tape at fastener penetrations get handled before a single composite board goes down. This stage is the easiest to shortcut and the hardest to fix later, so we don't rush it.

Decking, Fascia, and Finish Details

Boards go down with hidden fastener clips, proper spacing for drainage and seasonal movement, and fascia or trim boards to hide the substructure. Railings, stairs, and any post caps or lighting get installed last, along with a final check of every board's fastening and the ledger connection before we call the job done.

Composite vs. Other Decking Materials for a Property Like This

Homeowners in this area usually compare composite against pressure-treated wood or cedar before deciding. Here's how they generally stack up for a March Point property specifically:

FactorPressure-Treated WoodCedarCapped Composite
Moisture resistance in this climateTreated but still absorbs water; prone to cupping and splittingNaturally rot-resistant early on, degrades with sustained wet exposurePolymer cap resists surface moisture absorption
MaintenanceAnnual staining/sealing to prevent graying and rotRegular staining/sealing; sensitive to neglectOccasional cleaning; no staining or sealing needed
Moss and algae resistanceModerate — open grain holds moistureModerate — open grain holds moistureBetter — smoother capped surface sheds water faster
Upfront costLowestMid-rangeHigher
Cost over 15–20 yearsHigher (repeated staining, earlier repair/replacement)Higher (same pattern)Lower (minimal upkeep, longer service life)
Typical service life in coastal WA conditions10–15 years before major repair or replacement15–20 years with consistent maintenance25–30+ years, manufacturer-dependent

What Composite Decking Costs on a March Point Property

Composite decking costs more upfront than pressure-treated wood, and homeowners deserve a straight answer about that rather than a lowball number that doesn't hold up once a real quote arrives. As a broad range, fully installed composite decking in this region typically runs somewhere in the neighborhood of $35 to $65 per square foot, depending on the board tier, railing choice, and how much framing or ledger work the site needs. A few things move that number more than people expect:

  • Substructure condition — replacing rotted framing or upgrading ledger flashing on an existing structure adds cost, but it isn't optional if the deck needs to actually last
  • Board tier — composite lines range from entry-level to premium, and the difference usually shows up in fade resistance, warranty length, and how the cap holds up over time
  • Railing material — composite, aluminum, and cable railing all price differently and change the overall look of the finished deck
  • Site access and height — a second-story deck or a lot with tricky access takes longer to frame and costs more in labor
  • Square footage and shape — more corners, stairs, and custom cuts add labor time beyond a simple rectangular layout

The only way to get a number that means anything is a look at the actual property — a quote based on square footage alone, without seeing the site, isn't one we'd trust either.

Maintenance a Composite Deck Actually Needs Here

One of the real selling points of composite is how little it asks for, but "little" isn't "nothing," especially in a climate with this much moisture and moss pressure.

  • Rinse or sweep debris out of board gaps a few times a year so it doesn't trap moisture against the substructure
  • Wash the deck surface with soap and water, or a composite-safe cleaner, once or twice a year to stay ahead of algae film before it sets in
  • Check the ledger connection and any visible flashing periodically — it's the one spot on a composite deck that isn't maintenance-free
  • Keep gutters and nearby drainage clear so runoff isn't dumping extra water onto the deck surface
  • Avoid pressure-washing at close range or high pressure, which can damage the polymer cap on some composite products

What to Check Before Hiring for Deck Work in This Area

  • Ask whether they frame to the composite manufacturer's specific joist-spacing requirements or just use a standard wood-deck layout
  • Confirm how they handle ledger flashing and waterproofing — this is where most deck failures in wet climates actually start
  • Ask about fastener and hardware corrosion resistance, since salt air is harder on standard hardware than an inland location
  • Get a clear answer on manufacturer warranty coverage versus the contractor's own workmanship warranty
  • Verify the contractor is licensed, bonded, and insured to do this type of work in Washington

Why a Crew That Already Works March Point Matters

March Point doesn't see the volume of contractor traffic that busier parts of Anacortes and Skagit County do, and that gap shows up in how decks here sometimes get built. A crew that hasn't worked this specific exposure tends to frame and flash the way it would anywhere else, without accounting for the wind, salt air, and moss season this peninsula deals with more consistently than a sheltered inland lot. A crew that already works this area knows which lots hold moisture longest, which orientations take the worst weather, and what an early-failure ledger connection actually looks like on a house nearby. That's the kind of judgment that doesn't show up in a sales pitch, but it shows up in how the deck holds up ten years out.

Every property on March Point sits a little differently relative to sun, wind, and water, and the right deck design depends on the specific lot — its shade pattern, its grade, and what condition any existing structure is in. We're not going to recommend more deck than a property needs, and we're not going to cut corners on the framing and flashing details that actually determine how long it lasts.

If you're thinking about a composite deck for your March Point home, reach out for a free, no-pressure estimate. We'll walk the site, talk through layout and material options, and give you a straight answer on what it would actually take.

FAQ

Frequently asked questions

Do you need a permit to build a composite deck in Skagit County?

Most deck projects that involve new footings, framing attached to the house, or a structure above a certain height need a building permit from Skagit County or the City of Anacortes, depending on where the property sits. We handle that as part of the process rather than leaving it for the homeowner to sort out, and skipping it can create real problems later if you sell the house or need an inspection.

How can I verify a deck contractor is actually licensed in Washington?

Washington's Department of Labor & Industries maintains a public lookup where you can check a contractor's license status, bond, and insurance by name or license number. It takes a couple of minutes and is worth doing before signing anything, since an expired bond or lapsed insurance is a real risk if something goes wrong on the job.

Are all composite decking brands basically interchangeable?

No — composite lines vary a fair amount in cap quality, core material, color retention, and warranty length, and the cheaper end of the market tends to show fading, staining, or surface wear sooner than mid- and premium-tier products. We work with capped composite products from established manufacturers because of how the budget end tends to perform over time in a wet climate.

What kind of warranty comes with composite decking boards?

Most established manufacturers back their composite boards with structural warranties often in the 25-to-50-year range, plus a separate, usually shorter warranty covering fade and stain resistance. Exact terms vary by product line, so it's worth getting the specific warranty document for whatever board you're considering rather than assuming they're all the same.

Does composite decking handle Skagit County's moss and algae better than a wood deck?

Generally yes — a capped composite surface sheds water faster and doesn't have the open wood grain that moss and algae latch onto as easily, so it tends to need less scrubbing to stay clean. It isn't moss-proof, though, and a shaded or poorly drained deck of any material in this climate will still need occasional cleaning.

Free, no-pressure estimate

Get expert help in Anacortes.

Have questions about your deck project? Our local crew serves Anacortes and all of Skagit County — call or request a free on-site estimate.

360-205-1818

More guides

Related resources

Premium Brands We Install

James HardieFiber Cement Siding
TimberTechComposite Decking
FiberonComposite Decking
Sherwin-WilliamsExterior Paint
AZEKTrim & Mouldings
IKORoofing
ProViaEntry Doors
MilgardWindows
AndersenWindows
GAFRoofing
CertainTeedRoofing
James HardieFiber Cement Siding
TimberTechComposite Decking
FiberonComposite Decking
Sherwin-WilliamsExterior Paint
AZEKTrim & Mouldings
IKORoofing
ProViaEntry Doors
MilgardWindows
AndersenWindows
GAFRoofing
CertainTeedRoofing